Reshaping the Housing Landscape with Flex MSE
![Reshaping the Housing Landscape with Flex MSE](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee1612449_PHOTO-2023-06-29-09-48-16%202.jpg)
This brand new housing development offers stunning new homes, set in a picturesque town just 12 miles outside of York, offering a picturesque atmosphere and a countryside setting, with the Market Square and Georgian buildings providing an unspoiled and welcoming place to explore.
Tilia Homes specified the Flex MSE Vegetated retaining wall system to provide a boundary wall for the development that blends seamlessly into the natural surrounds.
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee1612452_PHOTO-2023-06-29-09-48-15.jpg)
Project: F3095
Construction Time: 1 Week
Flex MSE Units: 1,295
M2: 91
Type of Install: Reinforced Flex MSE Stretcher Bond Retaining Wall
Vegetation Solution: Hydroseeded
‘’We used the Flex MSE system on two developments to manage earthwork banking’s, providing a highly sustainable and natural retaining solution. Gravitas International and Nathan have been a pleasure to work with, as they facilitated a swift and efficient installation and delivered the project in line with the site's constraints.’’
Engineering Manager (Tilia Homes)
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee1612453_easingwold.png)
The above Project is currently in progress, with it either being at phase 1 of installation, phase 2 of installation, pre-hydroseeded or post-hydroseeded. Please return in 4-6 months to view the completed, fully vegetated case study.
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee1612466_IMG_2351.jpeg)
Gleeson Homes looks to Sustainable Retaining Walls
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee1612462_IMG_2605.jpeg)
Lancashire Council Endorses Flex MSE for Road Support
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee161244b_IMG-20230706-WA0014.jpg)
Essex Council Adopts Flex MSE for Flood Protection
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee1612450_IMG-20230706-WA0043.jpg)
Bellway Homes Specifies Flex MSE on Housing Development in Liverpool
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee1612378_scot%20cam.jpg)
Union Canal, Scotland chooses Flex MSE for Retaining wall
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee16122f8_costain%20foul%20water.jpg)
HydroSack® supports construction site from foul water entering public watercourse
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee16122f5_marriott%20hot.jpg)
Marriott Hotel finds flood protection solution for floodwater damage with HydroSack® and HydroSnake®
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee16122f3_HydroSnake%20Washing%20Machine.jpg)
Fife Council invest in Flood protection range of products
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee16122f0_flash%20floods.jpg)
HydroSack® supports Witton from freak storms and flash flooding
Somerset District Council provide flood protection initiative for over 3,000 effected by the recent floods.
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee16122eb_hydrosack1.jpg)
Hammersmith & Fulham Council switch to an alternative, affordable, more sustainable solution for flood protection
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee16122e8_hydrosnake_2-300x184.jpg)
Dumfries & Galloway Council confirm alternative to sandbags for flooding protection
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee1612223_617c18a96d147568ab45f3dd_Hammersmith-and-Fulham-Council-Keep-Things-Local_0001.jpeg)
Hammersmith & Fulham Council
![](https://uploads-ssl.webflow.com/65097d18d934568ee1611e9a/65097d18d934568ee1612227_617c1879616477235783ae80_239824522.jpg.gallery.jpeg)