Tilia Homes Specifies Flex MSE for Housing Developments
This new housing development is a quaint town in North Yorkshire, known as a gateway to the North York Moors and surrounded by rural farming areas, great local amenities and the River Leven.
Flex MSE retaining walls have been utilisied to incorporate an extended walkway seamlessly integrated into the environment. Our team of Geotechnical engineers skillfully designed the pathway within the system, ensuring its capacity to accommodate the additional loading's.
Project: F3120
Construction Time: 1 Week
Flex MSE Units: 1,197
M2: 64
Type of Install: Reinforced Flex MSE Flemish Bond Retaining Wall
Vegetation Solution: Hydroseeded
‘’We used the Flex MSE system on two developments to manage earthwork banking’s, providing a highly sustainable and natural retaining solution. Gravitas International and Nathan have been a pleasure to work with, as they facilitated a swift and efficient installation and delivered the project in line with the site's constraints.’’
Engineering Manager (Tilia Homes)
"We are proud to provide a range of ergonomic solutions through our BBA Approved Geo-Modular System, Flex MSE. These solutions not only offer time and cost savings but, more importantly, contribute to a sustainable approach for these housing developments. Our utmost priority is ensuring the quality of construction, and we take pride in our ability to offer turnkey solutions to address various site challenges. This expertise gives developers an added sense of assurance and peace of mind.
It has been a real pleasure collaborating with Tilia Homes on a number of projects this month. They are experienced developers, striving to deliver the highest possible standards in design, build quality and service, with quality new homes that align to the same vision and values that we have at Gravitas International.’’
Head of New Build Sales - Nathan Loofe
The above Project is currently in progress, with it either being at phase 1 of installation, phase 2 of installation, pre-hydroseeded or post-hydroseeded. Please return in 4-6 months to view the completed, fully vegetated case study.